Sunflower II, in Warren, WI in St Croix County, became energized in May 2017. The 2.34 MW solar field, consisting of 9,360 solar-tracking panels, is Dairyland Power’s latest project. After completion, Dairyland will have installed 19 MW of solar power in Wisconsin.