Madison’s LEED Gold Fleet Services Building Runs on Clean Energy Systems

The City of Madison’s $33 million Nekoosa Trail Fleet Building completed in 2021 is the state-of-the art for sustainability features supporting its LEED Gold certification by the US Green Building Council. The building is highly energy efficient, with solar tube and LED lighting, high levels of insulation, radiant floor heat, solar PV, solar hot water, solar hot air (solar wall), and solar electric vehicle charging stations that power the first working electric fire truck in North America and other EVs.  View photos of the clean energy elements at WSJ  Photos.

The LEED Gold Certified building’s design and construction team included CD Smith, Stantec, Meade & Hunt, Strand Associates, and HGA along with City Engineering.

More information at City of Madison